Field Enhancements
Losing one field at Poynter

Due to the recent approved Poynter JHS remodel, HBBA will lose the 20/30 field. Major renovations were made to this field as it was destined to be the best field of the group. Renovations over the last 5 years included:

  • Installed dust control irrigation to infield
  • Installed irrigation to remainder of ball field including renovating the infield system
  • Installed infield sod
  • Renovated outfield grass
  • HSD replaced field perimeter fencing

Items that were to be completed this year:

  • Remove and replace backstops and wings
  • Remove and replace dugouts
  • Bring power to field
Past Field Enhancements
Slideshow of the 2007 Mooberry field updates (shown above).
More Field Enhancements Slides