Losing one field at Poynter
Due to the recent approved Poynter JHS remodel, HBBA will lose the 20/30 field. Major renovations were made to this field as it was destined to be the best field of the group. Renovations over the last 5 years included:
- Installed dust control irrigation to infield
- Installed irrigation to remainder of ball field including renovating the infield system
- Installed infield sod
- Renovated outfield grass
- HSD replaced field perimeter fencing
Items that were to be completed this year:
- Remove and replace backstops and wings
- Remove and replace dugouts
- Bring power to field